Jump directly to content

Atir Strap: And Beamd With Crack New Fix

: Automatically divides models into construction stages (floor by floor) to accurately calculate forces during different building phases.

Gradually remove shoring and apply 125% of design load (simulated by water bags or hydraulic jacks). Measure crack movement—should remain <0.1 mm. atir strap and beamd with crack new

: If cracks are structural, the analysis results can inform repair strategies, such as using CFRP sheets Epoxy injection , to restore or enhance load-bearing capacity. 5. Conclusion The integration of atir strap and beamd with crack new